About Us
Universe Express Inc is aquality driven, full service Interstate and Local, Moving, Shipping and Storage Company.
We perform every type of relocation service and stand committed to quality, integrity and goodwill. Universe Express is unique in the industry, in that over 75% of our business comes from satisfied customer referrals.
We understand that our business thrives by making your move a positive and stress free experience. Our goal at Universe Express is to exceed your expectations.
We are fully insured, bonded and licensed by the ICC and DOT. Universe Express provides moving and shipping services anywhere in the United States, for residential and commercial customers.

How to handle a move involving heavy machinery and tools

A workshop move works nothing like a wardrobe on a trolley. A machine has mass, awkward geometry, bolted connections, hydraulic lines and a power supply, and it will not forgive a crew that turns up without a plan. The deciding factor is rarely the truck. It is what happens in the week before loading: measuring, disconnecting, protecting and documenting. Get that right and the transport itself is straightforward.

That discipline applies wherever you are based, though Australian conditions add their own wrinkles — metric load limits, council permits for kerbside parking, and a removalist market that talks openly about "backloading". Whether you are shifting a lathe from a Footscray workshop to a new shed in Geelong, moving a compressor from a camp near Newman to a depot outside Brisbane, or relocating production equipment between sites in Perth and Newcastle, the job breaks down into the same predictable stages.

Know exactly what you are moving

Start with an equipment schedule: a single document listing every machine and tool, its manufacturer, model, serial number, weight, and overall dimensions including the widest point. Note whether it can be split, what has to be removed before it moves, and what it needs on arrival — a three-phase supply, compressed air, a forklift, a technician to re-level it. Weight is the number that surprises people most. A benchtop machine may travel on a trolley; a two-tonne press or an excavator bucket changes the entire approach.

Photograph and label everything before a single bolt is touched. Capture the nameplate, the bolt pattern, cable runs and isolation points, then tag each item with a durable label and cross-reference it to the schedule so the riggers, the driver and the receiving site are all working from the same document. Australian sites run on metric measurements, and pallet sizes matter too: local forklifts and pallet jacks suit 1200 by 800 millimetre euro pallets, while equipment imported from North America often arrives on 48-inch by 40-inch skids that need converting or a purpose-built cradle.

Watch for hidden loads too. A machine full of tooling, a cabinet of dies, a compressor with a full receiver tank and a trailer of spare parts can weigh several times what the equipment list suggests. Include fuel, coolant, oil and any loose tooling in the figures you give a supplier, and state whether those fluids must be returned to the new site or can be disposed of.

Plan the route and the site before the truck arrives

Dimensions decide the vehicle and the route. A machine that clears a standard body may still need a low-loader float or a knuckle boom, and anything beyond legal width and length requires approval, route checking and, in Queensland and New South Wales, an escort vehicle. Sydney tolls, Melbourne's tram corridors and the narrow laneways of inner Brisbane can all defeat a load that looked comfortable on paper.

Site access deserves the same attention. Walk the driveway and yard before moving day: check for power poles, low branches, soft ground, kerb heights, gates and turning space, and confirm the crane or forklift has the reach it needs. Melbourne crews regularly deal with laneways through Fitzroy and Collingwood where overhead tram wires and a two-metre gap make a standard truck impossible without council parking permits and a spotter on foot. The same applies to the tight streets of Dandenong and the older industrial pockets of Newcastle.

Any levelling, new footings or trenching should trigger a call to Dial Before You Dig on 1100 before the riggers arrive with a jack. A cracked slab or a severed service line on the morning of the move costs far more than a two-minute phone call. Book the permit early, mark the services on the ground and brief the crew on where it is safe to place outriggers.

Rigging, skids and the right equipment

Machines travel on skids, timber cradles or purpose-built crates. Bolting a cradle to the machine's feet before the lift lets it be jacked, dragged across hardstand and lifted as one unit, and it prevents the frame twisting when the slings take load. The rigging supplier should confirm in writing what is being bolted, where the pick points are, and the safe working load of every sling and chain.

Most Australian moves hire a forklift by the day with a fuel-inclusive rate, which is simple to arrange in most capitals. Crane hire, particularly around the Hunter Valley, the Pilbara or Perth, costs more and needs its own mobilisation plan. A CNC machine, a press or a transformer usually requires a rigging crew with a lift plan, a licensed operator and a spotter, rather than a general removalist with a tail lift.

Decide what gets dismantled and what stays bolted. Splitting a machine is a planned operation with a technician present, not a decision made in the yard because the truck is running late. If the supplier needs to disconnect electrical, pneumatic or hydraulic services, arrange for a qualified tradesperson to do it and to sign off the isolation before the riggers take over.

Securing the load for Australian roads

Loads must be restrained to the national safe load securing code: chains and rated straps anchored to structural points, edge protection on crates, and no loose equipment in the cab. Straps get checked at the roadside and at delivery, so a hurried knot or a strap over a sharp casting edge will be flagged.

Before the doors close, drain fuel tanks to the legal limit, isolate hydraulic systems, disconnect batteries on older machines, and box small accessories with the destination address rather than a vague label like "workshop gear". Protect polished shafts, cylinder rods and exposed paint with grease, film or foam, and photograph the machine in its strapped state so any transit damage is easy to demonstrate.

Distance changes the risks. A run from Melbourne to Perth crosses the Nullarbor in summer heat, where hydraulic fluid thins and seals dry out; coastal salt around Newcastle or Bundaberg attacks exposed steel; dust from Toowoomba or the Pilbara works into everything. Plan a check on arrival for hydraulic pressure, coolant levels, electrical connections and anything that moved or rattled during transit.

Getting quotes that reflect the real job

Quotes for machinery moves usually arrive in two shapes: a removist price and a specialist rigging-and-transport price. Compare like with like, because a cheap figure that excludes dismantling, crating and craneage can turn into the expensive option on the day. Ask each supplier to itemise disconnection, protection, transport, lifting at both ends, re-levelling, and whether permits and escorts are included.

Brokers can take the chasing out of an interstate move, matching your load to carriers with the right equipment and safety record. The model is visible in how custom interstate quotes are put together: collect the details of the load, match it to professional interstate movers, then manage packing, loading, transport, unloading and storage as one job rather than four separate negotiations.

One Australian market quirk is worth understanding. Interstate removalists price a run as a two-way journey, so a backload — fitting your gear into a truck already travelling the opposite route — can cut the price substantially. A keen operator will mention it, and it is a legitimate way to save money if your schedule is flexible and your machine fits their existing run. Ask whether the quote assumes a dedicated truck or a backload, and get the answer in writing, along with what happens if the carrier's route changes.

Safety, insurance and compliance

Before work starts, confirm the carrier's public liability cover, the value at which the machinery is insured, and the workers' compensation and qualifications of everyone on site. Australian sites generally expect a white card and, for lifting operations, a current rigging ticket or an equivalent competency. If a crew member is unlicensed or unticketed, an insurer can reduce a claim to nothing.

Carrier reputation matters as much as price, and reading recent customer reviews is a quick way to spot operators who overpromise or underquote. If a broker is arranging the cover, ask in writing which company actually carries the cargo, what the excess is, and what evidence of insurance they will provide. Take photographs of the machine's condition on arrival and keep them with the delivery paperwork.

Compliance has a local layer as well. Heavy vehicle mass rules and dimension limits govern the truck and its load, and an over-mass combination attracts penalties that pass straight back to the customer through the carrier. Old machinery sheds can also hide asbestos in brake linings, gaskets and pipe lagging, so if the equipment is coming from a historic site, ask whether a clearance certificate applies before dismantling starts.

Timing, downtime and handover

Plan the move around production rather than around the truck. Schedule the disconnection with the plant, the rigging with the maintenance crew, the transport window, and the restart with a technician on site. Weekends and school holidays usually carry better rates and quieter roads. Build in contingency for a machine that will not start first go, and have the supplier's telephone number on speed dial.

Handover is where loose ends surface. Agree on a condition report, check every serial number against the schedule, confirm the machine is levelled and running, and hand back keys, remotes, manuals and spare parts in one documented pack. If the machine cannot go straight to its destination, settle who pays for storage, who holds the insurance, and how often the site will be inspected. A machine sitting for months needs batteries on a maintainer, hydraulic protection, and someone responsible for corrosion.

The practical takeaway is short and hard to skip: complete a one-page equipment schedule, photograph every connection and nameplate, confirm the route, permits and site access, and have the rigging plan and load-restraint method in writing before anyone books a truck. Quotes, timelines and insurance all fall into place once those items are settled, and the machine arrives the way it left.

Our experienced Sales Team takes the time to listen in an effort to provide you a competitive moving package that best meets your needs and budget.
Universe Express Customer Care Coordinators and Relocation Specialists are knowledgeable, personable and attentive. They provide accurate and extensive information about what to expect during your move.
© 2006-2009 Universe Express Inc. All Rights Reserved.
US-DOT: 1601312 • ICC-MC: 592337 • NJ-PC: 00096600
International Movers